Workshop on
‘Transportation of OIL & GAS through Pipelines’


July 08 – 10, 2009

Programme


Day - I July 08, 2009
1000 - 1030 hrs   Inaugural Session
 
 
 Welcome & Worlshop Details

Shri K.K. Gupta, ED, IIPM, IOCL

 
 Address
 Shri K.K. Jha, Director Designate (PL), IOCL 
 

 Presidential Address

 Shri J.P. Kapur, Trustee, Lovraj Kumar Memorial Trust

 

 Inaugural Address

Shri B.M. Bansal, Director (P&BD), IOCL

 
 Vote of Thanks

 Shri S.L. Das, Director (BD & C), PetroFed

 
1100 - 1330 hrs  
 
 
Overview on various modes of transportation of OIL & GAS (Sourcing of crude oil to Refineries, Gas as an input to the carrier pipeline, distribution of Refined petroleum products/      Gas to the various industries, Market Centre, end users – by Rail, Road, Sea, Pipelines – Percentage of total volume being transported through Pipelines – Benefit of transportation through Pipelines – Existing Oil & Gas Pipelines in India).
  Shri V.C. Sati, CPJM (Systems), PL, IOCL.[ Presentation]

 Question/Answer
 

 Route Selection of Pipeline – site selection of Intermediate Pump station – Delivery station – Terminals – Types of clearances required from different statutory bodies.

 Shri U.K. Pal, DGM (Civil) PL, IOCL. [Presentation]

 Question/Answer
 
1430 - 1630 hrs  
 
  Approach Plan of Design & Engineering in Pipelines.
 Shri Raj Kumar, Sr. Manager, EIL.
Shri Ashok Singh, Sr. Manager, EIL.[Presentation]  
 
 Question/Answer
 

Pipe specification including coating.

Shri Ranjit Choudhary, AGM, EIL.[Presentation]  
 
1645 - 1745 hrs  
 
Main Equipment, System in a Crude Oil & Product Pipelines.

  Shri V.K. Khurana GM (Mech) PL, IOCL

 
 Question/Answer
 
Day - II  July 09, 2009
0900 - 1030 hrs Site visit to MJPL, Bijwasan
1115 - 1245 hrs

 

 

 

Construction methodology, Type of construction equipment, Types of contractors required for construction of pipelines.

 Mr. G.K. Iyer, AGM, EIL. [Presentation]

 

 Question/Answer

 

1330 - 1500 hrs  
 

Telecommunication, Instrumentation & Supervisory Control & Data Acquisition System (SCADA) of Pipelines

Shri Anish Aggarwal, GM (PJ-Sys.&Gas) PL, IOCL[ Presentation]

 

 Question/Answer

 

1515 - 1630 hrs  
 

Codes/Standards/Safety guidelines to be followed/to be complied in Oil/Gas pipeline.

Shri Ashok Singh, Sr. Manager, EIL.
Shri M.S. Gunjiyal, Manager, EIL.[ Presentation]

 

 Question/Answer

 
1645 - 1745 hrs  
 

Indigenous Capabilities Development: Intelligent Pig Technology for Inline Inspection of Pipelines

Shri S.K. Singhal, DGM, (PL R&D), IOCL

 

 Question/Answer

 
Day - III  
 
 
0930 - 1100 hrs  
 

Intricacies of Design of a Gas pipeline & Main equipment, system in a Gas pipeline.

Shri Rahul Gautam, CM (Project Development) GAIL[ Presentation]

 

 Question/Answer

 
1115 - 1245 hrs  
 

Health Monitoring (External & internal), catholic protection of the total Pipeline system and remedial measures to be taken including preventive / breakdown maintenance of station / mainline equipment system.

Shri J.P. Sinha, CPJM, PL, IOCL [ Presentation]

 

 Question/Answer

 
1345 - 1445 hrs  
 

Start up and commissioning of pipelines.

Shri D.S. Nanaware, CPM, PL, IOCL.[ Presentation]

 

 Question/Answer

 
1500 - 1700 hrs  
 

Scheduling of crude oil & Product transportation, batching, interface tracking, quality assurance, volumetric custody transfer – how Pipelines recover cost.

Shri V.K. Malhotra, GM  PL, IOCL [ Presentation]

 
  Question/Answer
 
1700 - 1730 Concluding Session